Material clearance at the Lingen site
Safetec has been providing operational radiation protection and clearance services at the Lingen site for many years. Safetec has been providing operational radiation protection and clearance services at the Lingen site for many years. Up to 40 employees are deployed on site for the project. Approximately 300 metric tons of metal/plastic/concrete have been released in the project to date and 17 clearance documentations have been drawn up.
Our services:
- Deployment/management of Alpha workstations incl. associated measurements and documentation
- Operational radiation protection
- Preparation of radiation protection concepts
- Radiation protection planning and activities as part of the work permit procedure in accordance with the inspection, maintenance, repair, and radiation protection directive IWRS II in the integrated management system
- Daily radiation protection clearance as part of the work permit procedure
- Documentation, quality assurance, reporting of radiation protection activities
- Implementation of daily contamination and dose rate routines according to internal instructions
- Radiological environmental monitoring, emissions of exhaust air and waste water from the controlled area of the Lingen nuclear power plant
- Measurement technology
- Implementation and monitoring of quality management for radiation measurement technology
- Conducting of small repairs to radiation measurement equipment
- Conducting of inservice inspections on radiation measuring devices
- Conducting of gamma spectrometric measurements in accordance with the internal instructions Ü11, Ü35 in the controlled area
- Compilation, measurement, and sampling of combustible mixed waste and insulation material in accordance with in-house specifications from KA 02/16 and KA 09/16